Achivement and case studies : Industrial

C-nergie has delivered several energy efficiency projects for major industrial clients that have helped them to reduce energy consumption considerably and, at the same time, reduce their environmental footprint.


Heat recovery

Oldcastle, in conjunction with C-nergie’s team, has opted for a mechanical heat recovery and centralized control project. The heat from the dust collectors and from the hydraulic system will allow the plant to significantly reduce natural gas consumption and thus, reduce the greenhouse gas emissions associated with operating the building.

See more details

Air compressors

Concerned about the environmental impact of its business activities, JTI relies on C-nergie for a heat recovery project of their air compressors.

See more details

Berry Plastics chose the LED

C-nergie has been chosen to perform the lighting modernization at its main plant in Waterloo, Quebec. As for the whole plant, for both the interior and the exterior, LED lighting has been selected for its efficiency and low maintenance cost.

See more details

Arcelor Mittal

To modernize both its processing factories, C-nergie recommended sustainable and efficient industrial fluorescent light fixtures. The design of this new lighting takes into consideration the difficult environment typical of a metal processing plant. The new layout makes maintenance easier and improves the intensity of the lighting in work areas. The energy savings in this project were achieved by exceeding current standards.

See more details

Olymel

The different work environments at Olymel factories presented a significant challenge. Furthermore, the facility needed to comply with the Canada Food Inspection Agency's very strict food safety standards. Nevertheless, C-nergie improved the efficiency of nine factories over a period of three years. The recommendations on lighting always took into account the room temperature as well as the refrigeration or freezing temperatures.

See more details

Share